Collège Nouvelle- Frontière

Project description:
In this project, our team laid bricks on the school extension, as well as installing *Crazy Work* natural stone at the base of the walls, in order to preserve the building's existing appearance. A technical challenge successfully met by our team, despite the complexity of the job.

Scroll to Top